Dongxun 2266 fuel removal and overall salvage
Project introduction:
The ship was deeply silted up after capsizing, and the bow A-frame was fully inserted into the seabed. After the joint operation of two large lifting vessels of our company, the difficult ship successfully came out of the water in October 2016!
Vessel information:
Shipowner | Foshan Dongxunda Dreding | ||
Insurer | PICC | ||
Position | 广州,22°00.293’N/113°46.237E | ||
Water depth | 17 mtrs | ||
Total length | 80.2 mtrs | Profile width | 21 mtrs |
Profile width | 6.3 mtrs | No load displacement | 4591T |
Gross ton | 4108T | Net ton | 2300T |
- Last:Sinking and shoaling of the ship
- Next:Participated in the wreck removal and salvage project of amuriyah ship in the Middle East
-
Matters to be done by underwater [2022-05-16]
Underwater salvage refers to the process of salvaging flooded objects or removing navigation obstacles in channel and port waters.Underwater fishing design survey. diving. Jam. Underwater blasting. Un
-
Preparation before underwater fi [2022-05-16]
Underwater fishing is dangerous, so it is very necessary to make preparations in advance. Before underwater fishing, please use lifting tools to prepare in advance. Next, follow Xiaobian to understand
-
Basic principle of sunken ship s [2022-05-16]
What is the treatment principle of sunken ship salvage underwater engineering? The basic principle of underwater engineering is chemical grouting. Chemical grouting is to inject the pressure polymer m