Project introduction:


The ship was deeply silted up after capsizing, and the bow A-frame was fully inserted into the seabed. After the joint operation of two large lifting vessels of our company, the difficult ship successfully came out of the water in October 2016!


Vessel information:


Shipowner

Foshan Dongxunda Dreding

Insurer

PICC

Position

广州,22°00.293’N/113°46.237E

Water depth

17 mtrs

Total length

80.2 mtrs

Profile width

21 mtrs

Profile width

6.3 mtrs

No load displacement

4591T

Gross ton

4108T

Net ton

2300T

















Relevant cases
Relevant news
  • Discussion on salvage method of [2022-05-16]

    Sunken ship salvage in underwater salvage: six different methods can be adopted according to the size of sunken ship and the specific location of the event. However, various methods can be used alone,

  • Basic principle of sunken ship s [2022-05-16]

    What is the treatment principle of sunken ship salvage underwater engineering? The basic principle of underwater engineering is chemical grouting. Chemical grouting is to inject the pressure polymer m

  • Environmental requirements for u [2022-05-16]

    Underwater cutting is another underwater project. With the rapid development of economy, underwater cutting is more and more widely used. What are the environmental requirements of underwater cutting?