Hello, welcome to DALI UNDERWATER CONSTRUCTION GROUP CO.,LTD official website! Site map | xml
CASEHOME > CASE

Dongxun 2266 fuel removal and overall salvage

Release time:2022-05-07 07:27:20 Browse:371Times

Project introduction:


The ship was deeply silted up after capsizing, and the bow A-frame was fully inserted into the seabed. After the joint operation of two large lifting vessels of our company, the difficult ship successfully came out of the water in October 2016!


Vessel information:


Shipowner

Foshan Dongxunda Dreding

Insurer

PICC

Position

广州,22°00.293’N/113°46.237E

Water depth

17 mtrs

Total length

80.2 mtrs

Profile width

21 mtrs

Profile width

6.3 mtrs

No load displacement

4591T

Gross ton

4108T

Net ton

2300T

















Relevant cases
Relevant news
  • Environmental requirements for u [2022-05-16]

    Underwater cutting is another underwater project. With the rapid development of economy, underwater cutting is more and more widely used. What are the environmental requirements of underwater cutting?

  • Discussion on salvage method of [2022-05-16]

    Sunken ship salvage in underwater salvage: six different methods can be adopted according to the size of sunken ship and the specific location of the event. However, various methods can be used alone,

  • Precautions for underwater cutti [2022-05-16]

    (1) Investigate the landscape image, water depth, water temperature, flow rate and other environment of the operation area. It can be operated only when the wind force on the water surface is less tha