Dongxun 2266 fuel removal and overall salvage

Release time:2022-05-07 07:27:20 Browse:670Times

Project introduction:


The ship was deeply silted up after capsizing, and the bow A-frame was fully inserted into the seabed. After the joint operation of two large lifting vessels of our company, the difficult ship successfully came out of the water in October 2016!


Vessel information:


Shipowner

Foshan Dongxunda Dreding

Insurer

PICC

Position

广州,22°00.293’N/113°46.237E

Water depth

17 mtrs

Total length

80.2 mtrs

Profile width

21 mtrs

Profile width

6.3 mtrs

No load displacement

4591T

Gross ton

4108T

Net ton

2300T

















Relevant cases
Relevant news
  • Precautions for underwater cutti [2022-05-16]

    (1) Investigate the landscape image, water depth, water temperature, flow rate and other environment of the operation area. It can be operated only when the wind force on the water surface is less tha

  • Precautions for offshore wind po [2022-05-16]

    Wind power hoisting is a very important task, especially in offshore wind power hoisting, we must do a good job in all aspects of protection. For wind power hoisting, we generally need to pay attentio

  • Discussion on salvage method of [2022-05-16]

    Sunken ship salvage in underwater salvage: six different methods can be adopted according to the size of sunken ship and the specific location of the event. However, various methods can be used alone,