Overall salvage of the wreck of Jbb Rong Chang 8 sand ship in Malaysia
Project introduction:
The ship is a sand suction ship, which ran aground on the way to the sea area of Malacca in March 2018. The overall salvage operation began in May 2018 and was completed in June of the same year.
Vessel information:
Shipowner | Rongchang Shipping Sdn Bhd | ||
Position | Mapo, Malaysia | ||
Water depth | 40m | ||
Total length | 121.8m | Profile width | 18.8m |
Profile depth | 8.8m | Gross net load ton | 6200T |

- Last:JBB YU HANG 258 Overall salvage of the sunken Malaysian sand ship
- Next:Participate in the disassembly and salvage of the wreckage of thorco cloud bulk carrier in Indonesia
-
JBB YU HANG 258 Overall salvage of the sunken Malaysian sand ship
-
Participate in the disassembly and salvage of the wreckage of thorco cloud bulk carrier in Indonesia
-
Underwater oil pumping and obstacle removal and salvage of the wreck of Malaysia Cai Jun 3 sand ship
-
Overall salvage of the wreck of Jbb Rong Chang 8 sand ship in Malaysia
-
Matters to be done by underwater [2022-05-16]
Underwater salvage refers to the process of salvaging flooded objects or removing navigation obstacles in channel and port waters.Underwater fishing design survey. diving. Jam. Underwater blasting. Un
-
Precautions for underwater cutti [2022-05-16]
(1) Investigate the landscape image, water depth, water temperature, flow rate and other environment of the operation area. It can be operated only when the wind force on the water surface is less tha
-
Environmental requirements for u [2022-05-16]
Underwater cutting is another underwater project. With the rapid development of economy, underwater cutting is more and more widely used. What are the environmental requirements of underwater cutting?