Hello, welcome to DALI UNDERWATER CONSTRUCTION GROUP CO.,LTD official website! Site map | xml
CASEHOME > CASE

Overall salvage of the wreck of Jbb Rong Chang 8 sand ship in Malaysia

Release time:2022-05-07 06:36:26 Browse:456Times

Project introduction:

The ship is a sand suction ship, which ran aground on the way to the sea area of Malacca in March 2018. The overall salvage operation began in May 2018 and was completed in June of the same year.


Vessel information:


Shipowner

Rongchang Shipping Sdn Bhd

Position

Mapo, Malaysia

Water depth

40m

Total length

121.8m

Profile width

18.8m

Profile depth

8.8m

Gross net load ton

6200T


微信截图_20220507143637

Relevant cases
Relevant news
  • What is channel dredging? [2022-05-16]

    Dredging is an underwater earthwork excavation project that uses manpower or machinery to dredge, expand or excavate deep rivers, lakes and other waters. For a long time, channel dredging has been an

  • Preparation before underwater fi [2022-05-16]

    Underwater fishing is dangerous, so it is very necessary to make preparations in advance. Before underwater fishing, please use lifting tools to prepare in advance. Next, follow Xiaobian to understand

  • Precautions for underwater cutti [2022-05-16]

    (1) Investigate the landscape image, water depth, water temperature, flow rate and other environment of the operation area. It can be operated only when the wind force on the water surface is less tha