JBB YU HANG 258 Overall salvage of the sunken Malaysian sand ship
Project introduction:
The ship ran aground in Batu Pahat waters in Malaysia in November 2017. After less than a month's efforts, the overall salvage operation was successfully completed in January 2018.。
Vessel information:
Shipowner | JBB Shipping Co.,Limited | |||
Position | Malaysia,01°45.8N/102°43.9E | |||
Water depth | 20m | |||
Total length | 112.8m | Profile width | 20.8m | |
Profile depth | 8.6m | Gross net load ton | 5696T | |

- Last:Underwater oil pumping and obstacle removal and salvage of the wreck of Malaysia Cai Jun 3 sand ship
- Next:Overall salvage of the wreck of Jbb Rong Chang 8 sand ship in Malaysia
-
Sinking and shoaling of the ship
-
Underwater oil pumping and obstacle removal and salvage of the wreck of Malaysia Cai Jun 3 sand ship
-
Light of the century sunken cargo and wreck removal and salvage
-
Overall salvage of the wreck of Jbb Rong Chang 8 sand ship in Malaysia
-
Precautions for underwater cutti [2022-05-16]
(1) Investigate the landscape image, water depth, water temperature, flow rate and other environment of the operation area. It can be operated only when the wind force on the water surface is less tha
-
Matters to be done by underwater [2022-05-16]
Underwater salvage refers to the process of salvaging flooded objects or removing navigation obstacles in channel and port waters.Underwater fishing design survey. diving. Jam. Underwater blasting. Un
-
Environmental requirements for u [2022-05-16]
Underwater cutting is another underwater project. With the rapid development of economy, underwater cutting is more and more widely used. What are the environmental requirements of underwater cutting?