Underwater oil pumping and obstacle removal and salvage of the wreck of Malaysia Cai Jun 3 sand ship
Project introduction:
The ship sank into the sea in March 2017. Due to geographical factors, it was highly valued by the maritime administration of Malaysia and the maritime administration of Singapore, and the obstacle removal and salvage operation was successfully completed in January 2018.
Vessel information:
Shipowner | BOXING Investment Co.,Limited | ||
Insurer | Hanseatic | ||
Position | Malaysia,01°25.915’N/104°27.389’E | ||
Water depth | 40m | ||
Total length | 139.8m | Profile width | 22m |
Profile depth | 10.5m | Gross net load ton | 9994T |
Atlas of underwater pumping:
Construction drawing of obstacle removal and salvage site:
During the construction period, the Malaysian maritime authority has visited the construction site for many times to guide the work.
The project was successfully completed in January 2018 and was highly recognized by the maritime authority of Malaysia and the maritime authority of Singapore.
- Last:Salvage of the wreck of Myanmar Dong theien Phu silver bulk carrier
- Next:JBB YU HANG 258 Overall salvage of the sunken Malaysian sand ship
-
Environmental requirements for u [2022-05-16]
Underwater cutting is another underwater project. With the rapid development of economy, underwater cutting is more and more widely used. What are the environmental requirements of underwater cutting?
-
Basic principle of sunken ship s [2022-05-16]
What is the treatment principle of sunken ship salvage underwater engineering? The basic principle of underwater engineering is chemical grouting. Chemical grouting is to inject the pressure polymer m
-
Matters to be done by underwater [2022-05-16]
Underwater salvage refers to the process of salvaging flooded objects or removing navigation obstacles in channel and port waters.Underwater fishing design survey. diving. Jam. Underwater blasting. Un