Underwater oil pumping and obstacle removal and salvage of the wreck of Malaysia Cai Jun 3 sand ship
Project introduction:
The ship sank into the sea in March 2017. Due to geographical factors, it was highly valued by the maritime administration of Malaysia and the maritime administration of Singapore, and the obstacle removal and salvage operation was successfully completed in January 2018.
Vessel information:
Shipowner | BOXING Investment Co.,Limited | ||
Insurer | Hanseatic | ||
Position | Malaysia,01°25.915’N/104°27.389’E | ||
Water depth | 40m | ||
Total length | 139.8m | Profile width | 22m |
Profile depth | 10.5m | Gross net load ton | 9994T |
Atlas of underwater pumping:
Construction drawing of obstacle removal and salvage site:
During the construction period, the Malaysian maritime authority has visited the construction site for many times to guide the work.
The project was successfully completed in January 2018 and was highly recognized by the maritime authority of Malaysia and the maritime authority of Singapore.
- Last:Salvage of the wreck of Myanmar Dong theien Phu silver bulk carrier
- Next:JBB YU HANG 258 Overall salvage of the sunken Malaysian sand ship
-
Charging basis for underwater sa [2022-05-16]
At present, many consumers come to our company for inspection and consultation on the underwater rescue price of our technicians. What is the price measurement standard? Why are some prices very low a
-
Precautions for offshore wind po [2022-05-16]
Wind power hoisting is a very important task, especially in offshore wind power hoisting, we must do a good job in all aspects of protection. For wind power hoisting, we generally need to pay attentio
-
Preparation before underwater fi [2022-05-16]
Underwater fishing is dangerous, so it is very necessary to make preparations in advance. Before underwater fishing, please use lifting tools to prepare in advance. Next, follow Xiaobian to understand