Participate in the disassembly and salvage of the wreckage of thorco cloud bulk carrier in Indonesia
Project introduction:
On October 12, 2019, our ship "Hongbang 6" used DP2 for the first time to assist Guangzhou Salvage Bureau in completing the salvage project of the wreckage of Antigua and Barbuda bulk carrier "thoro cloud" in the Indonesian sea area with a water depth of 70 meters.
Vessel information:
Loading condition | About 8078 tons of railway rails and oil field equipment | ||
Water depth | 70m | Position | Indonesia |
Total length | 145.63M | Profile width | 18.25M |
Profile depth | 10.3M | Oil load | 560T |

- Last:Overall salvage of the wreck of Jbb Rong Chang 8 sand ship in Malaysia
- Next:Disintegration and salvage of the sunken ship Jinmei
-
Light of the century sunken cargo and wreck removal and salvage
-
JBB YU HANG 258 Overall salvage of the sunken Malaysian sand ship
-
Underwater oil pumping and obstacle removal and salvage of the wreck of Malaysia Cai Jun 3 sand ship
-
Salvage of the wreck of Myanmar Dong theien Phu silver bulk carrier
-
What is channel dredging? [2022-05-16]
Dredging is an underwater earthwork excavation project that uses manpower or machinery to dredge, expand or excavate deep rivers, lakes and other waters. For a long time, channel dredging has been an
-
Precautions for underwater cutti [2022-05-16]
(1) Investigate the landscape image, water depth, water temperature, flow rate and other environment of the operation area. It can be operated only when the wind force on the water surface is less tha
-
Precautions for offshore wind po [2022-05-16]
Wind power hoisting is a very important task, especially in offshore wind power hoisting, we must do a good job in all aspects of protection. For wind power hoisting, we generally need to pay attentio