Clearance and salvage of stern end of WAKASHIO ship in Mauritius
Project introduction:
On July 25, 2020, the bulk carrier "nakashio" ran aground and fractured off the southeast coast of Mauritius. After the bow section was removed, "Hongbang 6" ship cleared and salvaged the stern section. On January 16, 2022, all fishing operations were successfully completed.
Vessel information:
Shipowner | Okiyo Maritime Corporation | ||
Insurance company | Japan P&I | ||
Water depth | 15m | Deadweight ton | 13814T |
Total length | 299.95m | Profile width | 50.00m |
Profile depth | 24.1m | Gross ton | 101931T |
- Last:Nothing;
- Next:Sunken cargo of Indian SSL Kolkata container ship and dismantling and salvage of sunken ship
-
What is channel dredging? [2022-05-16]
Dredging is an underwater earthwork excavation project that uses manpower or machinery to dredge, expand or excavate deep rivers, lakes and other waters. For a long time, channel dredging has been an
-
Environmental requirements for u [2022-05-16]
Underwater cutting is another underwater project. With the rapid development of economy, underwater cutting is more and more widely used. What are the environmental requirements of underwater cutting?
-
Steps of underwater exploration [2022-05-16]
1. Underwater search: two search team members in each group enter the water in the order planned in advance. The team member who arrives at the bottom table first must wait until another team member a