HONG BANG 6-2000T full-rotating Crane Barge


- Last:Nothing;
- Next:DE JI 6-700T full-rotating Crane Barge
-
Clearance and salvage of stern end of WAKASHIO ship in Mauritius
-
Disintegration and salvage of the sunken ship Jinmei
-
Participated in the wreck removal and salvage project of amuriyah ship in the Middle East
-
Sunken cargo of Indian SSL Kolkata container ship and dismantling and salvage of sunken ship
-
Steps of underwater exploration [2022-05-16]
1. Underwater search: two search team members in each group enter the water in the order planned in advance. The team member who arrives at the bottom table first must wait until another team member a
-
Precautions for underwater cutti [2022-05-16]
(1) Investigate the landscape image, water depth, water temperature, flow rate and other environment of the operation area. It can be operated only when the wind force on the water surface is less tha
-
Environmental requirements for u [2022-05-16]
Underwater cutting is another underwater project. With the rapid development of economy, underwater cutting is more and more widely used. What are the environmental requirements of underwater cutting?