Hello, welcome to DALI UNDERWATER CONSTRUCTION GROUP CO.,LTD official website! Site map | xml
EQUIPMENTSHOME > EQUIPMENTS

HONG BANG 6-2000T full-rotating Crane Barge

Release time:2022-05-07 02:13:35 Browse:684Times

4_06_024_06


Related products
Relevant news
  • Precautions for underwater cutti [2022-05-16]

    (1) Investigate the landscape image, water depth, water temperature, flow rate and other environment of the operation area. It can be operated only when the wind force on the water surface is less tha

  • Steps of underwater exploration [2022-05-16]

    1. Underwater search: two search team members in each group enter the water in the order planned in advance. The team member who arrives at the bottom table first must wait until another team member a

  • Basic principle of sunken ship s [2022-05-16]

    What is the treatment principle of sunken ship salvage underwater engineering? The basic principle of underwater engineering is chemical grouting. Chemical grouting is to inject the pressure polymer m