DE JI 6-700T full-rotating Crane Barge


-
Disintegration and salvage of the sunken ship Jinmei
-
Underwater oil pumping and obstacle removal and salvage of the wreck of Malaysia Cai Jun 3 sand ship
-
Participate in the disassembly and salvage of the wreckage of thorco cloud bulk carrier in Indonesia
-
Overall salvage of the wreck of Jbb Rong Chang 8 sand ship in Malaysia
-
Charging basis for underwater sa [2022-05-16]
At present, many consumers come to our company for inspection and consultation on the underwater rescue price of our technicians. What is the price measurement standard? Why are some prices very low a
-
Basic principle of sunken ship s [2022-05-16]
What is the treatment principle of sunken ship salvage underwater engineering? The basic principle of underwater engineering is chemical grouting. Chemical grouting is to inject the pressure polymer m
-
Precautions for underwater cutti [2022-05-16]
(1) Investigate the landscape image, water depth, water temperature, flow rate and other environment of the operation area. It can be operated only when the wind force on the water surface is less tha