DE JI 6-700T full-rotating Crane Barge


-
Light of the century sunken cargo and wreck removal and salvage
-
Underwater oil pumping and obstacle removal and salvage of the wreck of Malaysia Cai Jun 3 sand ship
-
Dongxun 2266 fuel removal and overall salvage
-
Participated in the wreck removal and salvage project of amuriyah ship in the Middle East
-
Precautions for underwater cutti [2022-05-16]
(1) Investigate the landscape image, water depth, water temperature, flow rate and other environment of the operation area. It can be operated only when the wind force on the water surface is less tha
-
Environmental requirements for u [2022-05-16]
Underwater cutting is another underwater project. With the rapid development of economy, underwater cutting is more and more widely used. What are the environmental requirements of underwater cutting?
-
Preparation before underwater fi [2022-05-16]
Underwater fishing is dangerous, so it is very necessary to make preparations in advance. Before underwater fishing, please use lifting tools to prepare in advance. Next, follow Xiaobian to understand