Hello, welcome to DALI UNDERWATER CONSTRUCTION GROUP CO.,LTD official website! Site map | xml
EQUIPMENTSHOME > EQUIPMENTS

DE JI 7-400T full-rotating Crane Barge

Release time:2022-05-07 02:13:32 Browse:600Times

6_02_026_05

Related products
Relevant news
  • Precautions for offshore wind po [2022-05-16]

    Wind power hoisting is a very important task, especially in offshore wind power hoisting, we must do a good job in all aspects of protection. For wind power hoisting, we generally need to pay attentio

  • Discussion on salvage method of [2022-05-16]

    Sunken ship salvage in underwater salvage: six different methods can be adopted according to the size of sunken ship and the specific location of the event. However, various methods can be used alone,

  • Steps of underwater exploration [2022-05-16]

    1. Underwater search: two search team members in each group enter the water in the order planned in advance. The team member who arrives at the bottom table first must wait until another team member a