Sunken cargo of Indian SSL Kolkata container ship and dismantling and salvage of sunken ship
Project introduction:
On June 14, 2018, the "SSL Kolkata" container ship went from the south port of krishnapat, India to the port of Calcutta along the route, and caught fire after an explosion. After the crew abandoned the ship, the ship ran aground in sandheads, Calcutta. The "Hongbang 6" ship actually took 35 days to successfully complete the project.
Vessel information:
Shipowner | Shreyas Shipping | ||
Position | Kolkata, India | ||
Water depth | 15m | Deadweight ton | 13814T |
Total length | 299.95m | Profile width | 50.00m |
Profile depth | 24.1m | Gross ton | 101931T |

- Last:Clearance and salvage of stern end of WAKASHIO ship in Mauritius
- Next:Light of the century sunken cargo and wreck removal and salvage
-
Disintegration and salvage of the sunken ship Jinmei
-
Light of the century sunken cargo and wreck removal and salvage
-
JBB YU HANG 258 Overall salvage of the sunken Malaysian sand ship
-
Clearance and salvage of stern end of WAKASHIO ship in Mauritius
-
What is channel dredging? [2022-05-16]
Dredging is an underwater earthwork excavation project that uses manpower or machinery to dredge, expand or excavate deep rivers, lakes and other waters. For a long time, channel dredging has been an
-
Environmental requirements for u [2022-05-16]
Underwater cutting is another underwater project. With the rapid development of economy, underwater cutting is more and more widely used. What are the environmental requirements of underwater cutting?
-
Preparation before underwater fi [2022-05-16]
Underwater fishing is dangerous, so it is very necessary to make preparations in advance. Before underwater fishing, please use lifting tools to prepare in advance. Next, follow Xiaobian to understand